| 2014 | ABN
KUALA LUMPUR |
CIVIL TRENCHING
AND DUCT LAYING IN MPSJ SELANGOR AREA INCLUDING INSTALLTION OF NEW POLE/MH/HH/PED for HFC DISTRIBUTION |
PERIOD : MAY 2014 to Dec
2014 -INSTALLATION OF DUCT LAYING & CABLE LAYING & TERMINATION WORKS |
| 2014 | KUANTAN PORT
KUANTAN |
GISSAR PROJECT
PIPING FABRICATION & SKID ASSEMBLY ERECTION. |
v FABRICATION OF SCH
160 & SCH XXS PIPING SPOOLS FOR MODULE G623,G611 & G613
v ERECTION/ ASSEMBLY WITH SKID AT KUANTAN PORT FOR MOD G963A, MOD G963C & G963E
v WELDERS OF 6G QUALIFIED WELDERS ENGAGED IN THIS PROJECT.
v WQT AND FOLLOWED THE WPS FOR ALL THE TYPE OF MATERIALS LIKE LOW TEMP MATERIALS & STAINLESS STEEL. |
| ON GOING PROJECT | |||
|
2015 |
PRAI POWER
STATION, PENANG |
STEEL STRUCTRAL &
CABLE TRAY INSTALLATION,, CABLE LAYING & TERMINATION |
v ERECTION OF COLUMN ,
STRUCTRAL WORKS, PLATFORMS.(1000MW BOILER)
v CABLE TRAY FARICATION AND INSTALLATION WORKS
v CABLE LAYING FOR ALL SIZES OF CABLE FROM SINGLE CORE TO 11kV IN THE BOILER & TURBINE |
|
PRAI POWER STATION, PENANG |
v CABLE TERMINATION & CONTROL PANEL ERECTION WORKS.
v ENGAGED 110 WORKERS FROM OWN MANPOWER RESOURECS AND 70% WORKS COMPLETED, EXPECTED TO COMPLETE BY END OF JUNE 2015. |
||
| 2015 | Manjung Power
Station, Perak |
FAST TRACK 3A 1*
1000MW COAL FIRED POWER PLAT PROJECT.
ASH & COAL HANDLING EQUIPMENTS & STEEL STRUCTRAL.
CABLE TRAY INSTALLATION,, CABLE LAYING & TERMINATION |
v ASH HANDLING SYSTEM
EQUIPEMENTS and STRUCTRALS ERECTION.
v CABLE LAYING FOR ALL SIZES OF CABLE FROM SINGLE CORE TO 11kV IN THE BOILER & TURBINE
v WILL BE ENGAGED 80 WORKERS FROM OWN MANPOWER RESOURECS |